| |
Days 1 to 14 |
WTL 3000 |
(Way out) This old corridor
has not been used in a long time. It angles down steeply into the earth. |
 |
The corridor continues to the east, going up and down with
the occasional bend until it rises steeply to come out at the bottom of a mountain valley. |
 |
|
|
Into the shaft. |
Three days to the end of the tunnel hex G10. |
| |


|